The project installed a biofiltration system comprised of vegetated swales and an infiltration trench that will collect runoff from a 7.5-acre area and remove bacteria, oil, trash and suspended solids from stormwater that would otherwise be discharged to Santa Monica Bay. Shrubs and trees were also planted in the project area, and an automated irrigation system that uses recycled water was installed.